1. A survey of scheduling problems with setup times or costs;Allahverdi;European Journal of Operational Research,2008
2. Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility;Nazarian;Journal of Manufacturing Systems,2010
3. An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times;Zandieh;Applied Mathematics and Computation,2006
4. Industrial scheduling;Sule,1997
5. Job shop scheduling with group dependent setups, finite buffers, and long time horizon;Luh;Annals of Operations Research,1998