1. M. Pellegrini, et al., “Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Plant (BSAF), Phase 1, Final Report, (2015).
2. OECD/NEA, “Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Plant (BSAF Project) – Phase 1, Summary Report, March 2015.” NEA/CSNI/R(2015)18 (2016).
3. Tokyo Electric Power Company, Inc., Evaluation of the situation of cores and containment vessels of Fukushima Daiichi Nuclear Power Station Units1 to 3 and examination into unsolved issues in the accident progression, Progress Report No. 2, Attachment 1-5, “Evaluation into the amounts of water injected to Unit 1 by fire engines” August 6, 2014.
4. Tokyo Electric Power Company, Inc., “Reactor imaging technology for fuel debris detection by cosmic ray muon”, March 19, 2015.
5. Tokyo Electric Power Company, Inc. Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV), Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV, April 10th 2015. http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2015/images/handouts_150410_01-e.pdf.