1. Taiwan Power Company, 2000. Final Safety Analysis Report, Chinshan Nuclear Power Station Unit 1 & 2.
2. Tang, J.R., et al., 2009. Inadvertent Startup of HPCI Transient Analysis for Chinshan BWR/4, INER Report.
3. Validation on the SEPD component of the TRACE Chinshan NPP Model with startup tests;Chen,2011
4. TRACE modelling of Chinshan NPP benchmark test;Chen,2010
5. GEZ-6415, 1977. Chinshan Nuclear Power Station Units 1 and 2 Control Systems Design Report, September.