1. INSP In-depth Safety Analysis Project, “Emergency Operating Instruction Analysis: Methodology Development”. Contract No. 257191-A-B9;Beelman,1999
2. Rivne NPP VVER-440 Thermal-Hydraulic Standard Problem Analysis Final Report – Steam Collector Rupture Transient;Borissenko,2003
3. Rivne NPP Standard Problem Definition Report – Rivne NPP Unit 1 Short Description and Transient Data Base;Borissenko,2000
4. Rivne NPP Standard Problem Analysis Report – Description of Rivne NPP Unit 1 RELAP Model;Borissenko,2002
5. RELAP5/MOD3 Code Manual User's Guidelines. NUREG/CR-5535, INEL-95/0174, vols. 1–4, rev. 1;Carlson,1990