1. Evaluation of the sensitivity of a two-phase flow model for the steam separators analysis;Chaki,2006
2. Test and study of cold condition for dryer in steam generator for 1000MW PWR nuclear power plant(C);Chen;Nucl. Power Eng.,2006
3. Proof test in hot condition on steam separation device in steam generator for 1000MW PWR nuclear power plant(C);Chen;Nucl. Power Eng.,2006
4. Artist: introduction and first results;Güntay,2004
5. PWR steam generators;Green;Int. J. Multiphase Flow,1995