1. Putting in a replacement for Controbloc P20 at Chooz B;Appell,1992
2. Regulatory assessment of the Darlington shutdown system trip computer software redesign;Chun,2000
3. Case study: Darlington Nuclear Generating Station;Craigen;IEEE Software,1994
4. Department of Energy, 2005. DOE NP2010 nuclear power plant construction infrastructure assessment. http://www.ne.doe.gov/np2010/reports/mpr2776Rev0102105.pdf.
5. DMID sample regulatory file review tool. Available from: http://www.niaid.nih.gov/LabsAndResources/resources/DMIDClinRsrch/Documents/rfrt.doc (accessed November 2010).