1. Badwan, F., et al., 1998. Data Call for a Mixed Oxide Fuel Fabrication Facility Located at the Pantex Plant, LA-UR-97-2067, Los Alamos National Laboratory, June 1998.
2. Bluhm, E.A., 2004. Pu02 Polishing for MOX Fuel Fabrication-Process Modifications and Upgrades, LA-UR-04-3749 (submitted to 28th Annual Actinide Separations Conference Asheville, NC), Los Alamos National Laboratory, June 2004.
3. DeMuth, S., 1997. Conceptual Design for Separation of Plutonium and Gallium by Solvent by Solvent Extraction, LA-UR-97-181, Los Alamos National Laboratory, April 1997.
4. DOE-9975, 2009. U. S. Department of Energy. Certificate of Compliance for Radioactive Material Packages – USA/9975/B(M)F-85 (DOE).
5. Hill, R.N., Briggs, L.L., et al., 2006. Advanced Burner Test Reactor Startup Fuel Evaluation, ANL-AFCI170, Argonne National Laboratory, June 30.