Author:
Xiong Fuli,Chu Mengling,Li Zhi,Du Yao,Wang Linting
Funder
Natural Science Foundation of Shaanxi Province
Xi'an University of Architecture and Technology
China Scholarship Council
National Natural Science Foundation of China
Natural Science Foundation of Shaanxi Provincial Department of Education
Subject
Management Science and Operations Research,Modelling and Simulation,General Computer Science
Reference63 articles.
1. A meta-heuristic to solve the just-in-time job-shop scheduling problem;Ahmadian;Eur. J. Oper. Res.,2020
2. Bargaoui, H., Driss, O. B., Gh+?dira, K., 2017. A novel chemical reaction optimization for the distributed permutation flowshop scheduling problem with makespan criterion. Comput. Ind. Eng. 111, 239–250.
3. Flowshop scheduling model for bespoke precast concrete production planning;Benjaoran;Constr. Manage. Econ.,2005
4. A tabu search algorithm for the single machine total weighted tardiness problem;Bilge;Eur. J. Oper. Res.,2007
5. An application of genetic algorithms to precast production scheduling;Chan;Comput. Struct.,2001
Cited by
38 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献