Subject
Management Science and Operations Research,Modeling and Simulation,General Computer Science
Reference49 articles.
1. The shifting bottleneck procedure for job shop scheduling;Adams;Manag Sci,1988
2. Measures of subproblem criticality in decomposition algorithms for shop scheduling;Aytug;Int J Prod Res,2002
3. Job shop scheduling with modified due dates;Baker;J Oper Manag,1983
4. Guided local search with shifting bottleneck for job shop scheduling;Balas;Manag Sci,1998
5. Behnke D, Geiger MJ. Test instances for the flexible job shop scheduling problem with work centers 2012. Technical Report. Helmut-Schmidt-Universität, Hamburg.
Cited by
43 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献