Funder
National Natural Science Foundation of China
Reference52 articles.
1. An overtime production inventory model for deteriorating items with nonlinear price and stock dependent demand;Abdul Halim;Alexandria Engineering Journal,2021
2. Afsar, S., Palacios, J., Puente, J., Vela C., & González-Rodríguez, I. (2022). Multi-objective enhanced memetic algorithm for green job shop scheduling with uncertain times. Swarm and Evolutionary Computation, 68(November 2021):101,016. 10.1016/j.swevo.2021.101016.
3. Greedy randomized adaptive search for dynamic flexible job-shop scheduling;Baykasoğlu;Journal of Manufacturing Systems,2020
4. Solving the flexible job shop scheduling problem using an improved Jaya algorithm;Caldeira;Computers & Industrial Engineering,2019
5. Caldeira, R., & Gnanavelbabu, A. (2021). A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem. Expert Systems with Applications, 170(August 2020):114,567. 10.1016/j.eswa.2021.114567.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献