1. Building cyclic master surgery schedules with leveled resulting bed occupancy;Belien;European Journal of Operational Research,2007
2. Resource-constrained project scheduling: Notation, classification, models, and methods;Brucker;European Journal of Operational Research,1999
3. Chaabane, S. (2004). Gestion prédictive des blocs opératoires. Ph.D. thesis, Institut National des Sciences Appliquées de Lyon.
4. Project scheduling: A research handbook;Demeulemeester,2002
5. Dréo, J., Pétrowski, A., Siarry, P., Taillard, E., (2003). Métaheuristiques pour l’optimisation difficile. Eyrolles.