Author:
Luo Hao,Fang Ji,Huang George Q.
Funder
National Natural Science Foundation of China
The University of Hong Kong Small project Fund
Subject
General Engineering,General Computer Science
Reference46 articles.
1. A survey of scheduling problems with setup times or costs;Allahverdi;European Journal of Operational Research,2008
2. Executing production schedules in the face of uncertainties: A review and some future directions;Aytug;European Journal of Operational Research,2005
3. Manufacturing planning and control: The evolution of MRP and JIT integration;Benton;European Journal of Operational Research,1998
4. Development of an agent-based system for manufacturing control and coordination with ontology and RFID technology;Chen;Expert Systems with Applications,2009
5. Cheng, F. T., Shen, E., Deng, J. Y., & Nguyen, K. (1998). Development of a distributed object-oriented system framework for the computer-integrated manufacturing execution system. In Robotics and Automation, Proceedings of IEEE International Conference, 3, 2116–2121.
Cited by
47 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献