Subject
General Engineering,General Computer Science
Reference75 articles.
1. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem;Agrawal;International Journal of Production Research,2008
2. A comparison of piecewise linear programming formulations for stochastic disassembly line balancing;Altekin;International Journal of Production Research,2017
3. Remedial actions for disassembly lines with stochastic task times;Altekin;Computers & Industrial Engineering,2016
4. Avikal, S., Jain, R., Yadav, H., & Mishra, P. K. (2014a). A new heuristic for disassembly line balancing problems with AND/OR precedence relations. In B. V. Babu, A. Nagar, K. Deep, et al., Proceedings of the second international conference on soft computing for problem solving (Vol. 236, pp. 519-525). Berlin: Springer-Verlag Berlin.
5. A fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems;Avikal;International Journal of Production Research,2014
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献