1. A robust hierarchical production planning for a capacitated two-stage production system;Aghezzaf;Computers and Industrial Engineering,2011
2. Rolling horizon procedures in nonhomogeneous markov decision processes;Alden;Operations Research,1992
3. A two-stage stochastic programming project scheduling approach to production planning;Alfieri;The International Journal of Advanced Manufacturing Technology,2012
4. Alvarez, P. P., Espinoza, A., Maturana, S., Vera, J. R. (2015). Improving consistency of tactical and operational planning using robust optimization. Technical report, Universidad Catolica de Chile, School of Engineering, Santiago, Chile.
5. Application of robust optimization to the sawmill planning problem;Alvarez;Annals of Operations Research,2014