Author:
Shahsavar Aria,Najafi Amir Abbas,Niaki Seyed Taghi Akhavan
Subject
General Engineering,General Computer Science
Reference47 articles.
1. Construction performance control by networks;Ahuja,1976
2. Optimal resource determination for project scheduling;Akpan;Production Planning and Control,1997
3. Resource leveling in make-to order production: Modeling and heuristic solution method;Ballestín;International Journal of Operations Research,2007
4. Optimal resource leveling using non-serial dynamic programming;Bandelloni;European Journal of Operational Research,1994
5. Heuristic procedures for resource-constrained project scheduling with minimal and maximal time lags: The resource-leveling and minimum project duration problems;Brinkmann;Journal of Decision Systems,1996
Cited by
27 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献