1. The impact of defects on a process with rework;Agnihothri;European Journal of Operational Research,1995
2. Performance analysis of manufacturing systems;Altiok,1997
3. Optimal allocation of inspection effort in a serial multi-stage production system;Bai;Computers & Industrial Engineering,1996
4. Burman, M. H. (1995). New results in flow line analysis. Thesis (PhD), Massachusetts Institute of Technology.
5. Chen, R. (2010). Analytical methods for performance enhancement in unreliable multistage manufacturing system with imperfect production. Thesis (PhD), National University of Singapore.