Author:
Guo Chengtao,Zhibin Jiang,Zhang Huai,Li Na
Subject
General Engineering,General Computer Science
Reference40 articles.
1. The shifting bottleneck procedure for job shop scheduling;Adams;Management Science,1988
2. Machine sequencing via disjunctive graphs: An implicit enumeration algorithm;Balas;Operations Research,1969
3. Benbouzid-Sitayeb, F., Ammi, I., Varnier, C., & Zerhouni, N. (2008). An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem. In 2008 IEEE international symposium on industrial electronics (pp. 2532–2537). Cambridge.
4. ACO applied to group shop scheduling: A case study on intensification and diversification;Blum,2002
5. Beam-ACO—Hybridizing ant colony optimization with beam search: An application to open shop scheduling;Blum;Computers & Operations Research,2005
Cited by
30 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献