Author:
Zhang Hong,Li Xiaodong,Li Heng,Huang Fulai
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference35 articles.
1. Resource-constrained project scheduling with time-resource tradeoffs: the nonpreemptive case;Talbot;Management Science,1982
2. Algorithms for multi-resource generalized assignment problem;Gavish;Management Science,1991
3. J.P. Stinson, A branch and bound algorithm for a general class resource-constrained scheduling problem. PhD Thesis, University of North Carolina at Chapel Hill, Chapel Hill, N.C., (1976).
4. Construction resource scheduling with genetic algorithms;Chan;Journal of Construction Engineering and Management, ASCE,1996
5. GA based multicriteria optimal model for construction scheduling;Leu;Journal of Construction Engineering and Management, ASCE,1999
Cited by
136 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献