Author:
Tian Limin,Hao Jiping,Wei Jianpeng,Zheng Jiang
Funder
Natural Science Foundation of China
Science and Technology Co-ordination and Innovation Fund Project of Shaanxi Province of China
Opening Funds of State Key Laboratory of Building Safety and Built Environment
Science and Technology Fund Project of the Ministry of Housing and Urban-Rural Development of China
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference22 articles.
1. Construction sequence simulation of a practical suspend-dome in Jinan Olympic Center;Li;Adv. Steel Constr.,2012
2. Second-order and advanced analysis of structures allowing for load and construction sequences;Liu;Adv. Struct. Eng.,2011
3. Integral lifting of a three-Span continuous beam bridge;Xu;J. Perform. Constr. Facil.,2015
4. The integral lifting project of the Qifeng bridge: case study;Zhao;J. Perform. Constr. Facil.,2011
5. Moving a reinforced-concrete building: case study;Telem;J. Constr. Eng. Manag.,2006