1. Factors affecting schedule delay, cost overrun, and quality level in public construction projects;Larsen;J. Manag. Eng.,2016
2. Total float traded as commodity;de la Garza;J. Constr. Eng. Manag.,1991
3. Critical path planning and scheduling;Kelley,1959
4. Ponce de Leon, G. (2009): GPM: An object-oriented project networking method. Presented at PMI College of Scheduling Annual Conference, Boston, MA, May 17–20, 2009, Project Management Institute, Newtown Square, PA: 8 pp. http://www.pmcos.org/members-only/conference-2009-proceedings/.
5. New trends and bad results in construction contracts, part I;Shumway;Leadersh. Manag. Eng.,2004