Author:
Huang Rong-yau,Sun Kuo-Shun
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference24 articles.
1. Planning construction of repetitive building units;Carr;J. Constr. Div., ASCE,1974
2. VPM scheduling for high-rise buildings;O'Brien;J. Constr. Div., ASCE,1975
3. Construction planning for linear projects;Selinger;J. Constr. Div., ASCE,1980
4. Linear scheduling method for highway construction;Johnston;J. Constr. Div., ASCE,1981
5. Time space scheduling method;Stradal;J. Constr. Div., ASCE,1982
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献