Author:
Kim Changyoon,Park Taeil,Lim Hyunsu,Kim Hyoungkwan
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference23 articles.
1. Automated progress tracking using 4D schedule and 3D sensing technologies;Turkan;Automation in Construction,2012
2. Deterioration of UWB positioning during construction;Shahi;Automation in Construction,2012
3. Ubiquitous sensor network for construction material monitoring;Kim;Journal of Construction Engineering and Management,2011
4. RFID and CCTV-based material delivery monitoring for cable-stayed bridge construction;Ju,2012
5. Multiple device collaborative and real time analysis system for project management in civil engineering;Pena-Mora;Journal of Computing in Civil Engineering,2002
Cited by
117 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献