Author:
Long Luong Duc,Ohsato Ario
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference32 articles.
1. Cost optimization in projects with repetitive nonserial activities;Hegazy;Journal of Construction Engineering and Management ASCE,2001
2. Work continuity constraints in project scheduling;Vanhoucke;Journal of Construction Engineering and Management ASCE,2006
3. Scheduling projects with repeating activities;Harris;Journal of Construction Engineering and Management ASCE,1998
4. Construction planning—beyond the critical path;Birrell;Journal of the Construction Division ASCE,1980
5. Construction planning for linear projects;Selinger;Journal of the Construction Division ASCE,1980
Cited by
96 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献