Author:
Kim JiWook,Golabchi Alireza,Han SangUk,Lee Dong-Eun
Funder
Ministry of Science and ICT, South Korea
National Research Foundation of Korea
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference68 articles.
1. Optimizing financing cost in construction projects with fixed project duration;Alavipour;J. Constr. Eng. Manag.,2018
2. Quantifying lost labor productivity in domestic and international claims;Zhao;J. Leg. Aff. Disput. Resolut. Eng. Constr.,2018
3. Estimation of optimal productivity in labor-intensive construction operations: advanced study;Kisi;J. Constr. Eng. Manag.,2018
4. Towards improving construction labor productivity and projects’ performance;Shehata;Alex. Eng. J.,2011
5. Comparison between labor input by quantity per unit method and by actual data method in the apartment housing construction work - focusing on masonry plaster waterproofing tile labors, Korean;Jeon;J. Constr. Eng. Manag.,2015
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献