Author:
Fateminia Seyed Hamed,Fayek Aminah Robinson
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference41 articles.
1. A method for risk response planning in project portfolio management;Ahmadi-Javid;Proj. Manag. J.,2020
2. An adaptive hybrid model for determining subjective causal relationships in fuzzy system dynamics models for analyzing construction risks;Fateminia;CivilEng.,2021
3. An interval type-2 fuzzy risk analysis model (IT2FRAM) for determining construction project contingency reserve;Fateminia;Algorithms.,2020
4. Subpart 22.5 - Use of Project Labor Agreements for Federal Construction Projects. 22.502 Definitions., United States, no date,2023
5. Evaluating risk response strategies on construction projects using a fuzzy rule-based system;Fateminia,2019
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献