Author:
Hosseini Ali,Lædre Ola,Andersen Bjørn,Torp Olav,Olsson Nils,Lohne Jardar
Reference39 articles.
1. Al Khalil, M.I. (2002). Selecting the appropriate project delivery method using AHP. International Journal of Project Management, 20(6), 469-474. doi: http://dx.doi.org/10.1016/S0263-7863(01)00032-1.
2. Alhazmi, T., & McCaffer, R. (2000). Project Procurement System Selection Model. Journal of Construction Engineering and Management, 126(3), 176-184. doi: 10.1061/(ASCE)0733-9364(2000)126:3(176).
3. Ardani, A., Jesaitis, P., & Guevara, B. (1999). Evaluation of design build practice in Colorado, IR (CX) 70-4 (143): Colorado Department of Transportation.
4. Arditi, D., & Lee, D.-E. (2003). Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), 175-185. doi: 10.1080/0144619032000079716.
5. Blumberg, B.F., Cooper, D.R., & Schindler, P.S. (2014). Business Research Methods (Fourth ed.): McGraw Hill Education.
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献