Author:
Ismail Faridah,Baharuddin Har Einur Azrin,Marhani Mohd Arif
Reference24 articles.
1. The significant factors causing delay of building construction projects in Malaysia. Engineering;Alaghbari;Construction and Architectural Management,2007
2. Cidb, (2003). Industrialised Building System Seminar 2003 – Towards Industrialisation of Malaysian Construction Industry. Malaysia: CIDB Malaysia.
3. Craig, N., and Sommerville, J., (2007). Records management and information processing on construction sites using digital pen and paper. Records Management Journal, Vol. 17 (3), pp.201-215.
4. Faridah Ismail, Norizan Ahmad, Nurul Afida Isnaini Janipha, Rasidah Ismail (2012) The Behavioral Factors’ Characteristics of Safety Culture. Journal for ASIAN Behavioural Studies (jABs) 2(4), 2012.
5. Gibb. A.G.F. (1999). Off-site fabrication: prefabrication, pre-assembly and modularisation. Whittles Publishing; UK.
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献