1. Integrating historical topographic maps and SRTM data to derive the bathymetry of a tropical reservoir;Alcântara;Journal of Hydrology,2010
2. Lesotho highlands water project - design of the 'Muela hydropower station;Arthur;Proceedings of the Institution of Civil Engineers,1997
3. Bailey, A. (2013). The orange–senqu river basin infrastructure catalogue. United Nations Development Programme (UNDP). United Nations Office for Project Services (UNOPS). Centurion: ORASECOM.
4. Soil erosion and reservoir sedimentation in Lesotho;Chakela,1981
5. DWAF (2014). Lesotho highlands water project (LHWP): Key statistics. Retrieved 04 28, 2014, from Department of Water Affairs - Republic of South Africa: 〈http://www.dwaf.gov.za/orange/up_orange/lhwpstat.aspx〉.