1. R5: assessment procedure for the high temperature response of structures, Issue 2, Revision 2,2001
2. Assessment of the high temperature response of structures; developments in the R5 procedure;Ainsworth,1996
3. Ainsworth RA, Budden PJ, Dean DW, O'Donnell MP, Tipping DJ, Goodall W, Hooton DG. Creep-fatigue crack initiation assessment procedures, SMIRT-16, Paper 1742, Washington DC; 2001.
4. Analysis of the Type IV creep failures of three welded ferritic pressure vessels;Budden;Int J Press Vessel Piping,1998
5. R5 creep assessment of welded trunnion and large bore branch components;Patel,2001