1. Redundant-wires-aware ECO timing and mask cost optimization;Fang,2010
2. TRECO: dynamic technology remapping for timing engineering change orders;Ho;IEEE Trans. Comput. Aided Des. Integrated Circ. Syst.,2012
3. ECO-Map: technology remapping for post-mask ECO using simulated annealing;Modi,2008
4. Reap what you sow: spare cells for post-silicon metal fix;Chang,2008
5. Minimal logic re-synthesis for engineering change;Swamy,1997