Funder
German Research Foundation
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering
Reference35 articles.
1. Al-Battaineh, H. T., AbouRizk, S. M., Tan, J., & Fernando, S. (2006). Productivity simulation during the planning phase of the Blencoe Tunnel in Calgary, Canada: A case study. In D. Nicol, R. Fujimoto, B. Lawson, J. Liu, F. Perrone, & F. Wieland (Eds.), Proceedings of the 2006 winter simulation conference (pp. 2087–2092).
2. A note on weighted criteria methods for compromise solutions in multi-objective optimization;Athan;Engineering Optimization,1996
3. Robust optimization – A comprehensive survey;Beyer;Computer Methods in Applied Mechanics and Engineering,2007
4. Chalupnik, M. J., Wynn, D. C., Eckert, C. M., & Clarkson, P. J. (2007). Understanding design process robustness: A modelling approach. In J.-C. Bocquet (Ed.), Proceedings of ICED 2007, the 16th international conference on engineering design.
5. On the assessment of performance and robustness of condition-based maintenance strategies;Cherkaoui;IFAC-PapersOnLine,2016
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献