1. Geotechnical Baseline Reports for Underground Construction: Guidelines and Practices;ASCE,1997
2. Standard Design and Construction Guidelines for Microtunneling, ASCE/CI 36-15;ASCE,2015
3. ASCE (2001). Standard Practice for Direct Design of Precast Concrete Pipe for Jacking in Trenchless Construction, ASCE Standard 27-00, 62.
4. Standard Construction Guidelines for Microtunneling, ASCE/CI 36-01;ASCE,2001
5. Geotechnical Baseline Reports for Construction – Suggested Guidelines;ASCE,2007