Author:
Ye Fei,Feng Haolan,Han Xingbo,Liang Xiaoming,Sun Haidong,Zhang Wenjun,Cao Xiaoyong
Funder
National Natural Science Foundation of China
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction,Civil and Structural Engineering
Reference24 articles.
1. Design and research of a new type of shield tail seal system for 0.65 MPa high water pressure shield machine;An;Journal of Oil and Gas Technology,2018
2. 3D response analysis of a shield tunnel segmental lining during construction and a parametric study using the ground-spring model;Chaipanna;Tunnelling and Underground Space Technology,2019
3. Pressures on the lining of a large shield tunnel with a small overburden: A case study;Han;Tunnelling and Underground Space Technology,2017
4. Research on Deformation Treatment and Control Technology of Tail Shield of Underwater Large Diameter Slurry Shield;Han;IOP Conference Series: Earth and Environmental Science,2021
5. Konda, T., Feddema, A., Brinkman, J., Hashimoto, T., & Kano, Y. (2006). Simultaneous backfill grouting, pressure development in construction phase and in the long-term. In Tunnelling. A Decade of Progress. GeoDelft 1995-2005. Taylor & Francis: 101–107.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献