1. Statistical assessment of rock burst potential and contributions of considered predictor variables in the task;Afraei;Tunnelling and Underground Space Technology,2018
2. Ahmed, S. S., ALHeib, M., Gunzburger, Y., & Renaud, V. (2017). Pillar Burst Assessment Based on Large-scale Numerical Modeling. Procedia Engineering, 191, 179–187.
3. Aubertin, M., Gill, D. E., & Simon, R. (1994). On the Use of the Brittleness Index Modified (BIM) to Estimate the Postpeak Behavior of Rocks. Rock Mechanics Models and Measurements Challenges from Industry. 1st North American Rock Mechanics Symposium, Austin, Texas.
4. Rock Burst;Avershin,1959
5. Assessment of Susceptibility of Rock Bursting in Tunnelling in Hard Rocks;Aydan;Modern Tunnelling Science and Technology,2001