Subject
General Earth and Planetary Sciences,General Environmental Science
Reference57 articles.
1. Schedule delay analysis;Stumpf;Cost Eng J 2000,2000
2. The significant factors causing delay of building construction projects in Malaysia;Alaghbari;Eng Const Archit Manage,2007
3. Conceptual delay mitigation model using a project learning approach in practice;Abdul-Raman;Const Manage Econ,2007
4. Construction delays and their causative factors in Nigeria;Aibinu;J Constr Eng Manage,2005
5. Construction planning and equipment methods;Peurifoy,1985
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献