1. P. Brucker and M.Y. Kovalyov, “Single machine batch scheduling to minimize the weighted number of late jobs”, submitted.
2. Resource optimal control in single-machine scheduling with completion time constraints;Cheng;IEEE Trans. Automatic Control,1994
3. Computers and Intractability: A Guide to the Theory of N-Completeness;Garey,1979
4. D.S. Hochbaum and D. Landy, “Scheduling with batching: minimizing the weighted number of tardy jobs”, submitted.
5. Scheduling a production line to minimize maximum tardiness;Jackson,1955