1. Automatic identification of the working state of high-rise building machine based on machine learning;Pan;Appl. Sci.,2023
2. Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data;Jiang;Eng. Construct. Architect. Manag.,2021
3. Site Automation: Automated/Robotic On-Site Factories;Bock,2016
4. Digital twin and IOT technology for secure manufacturing systems;Gopal;Meas.: Sens.,2023
5. Experimental research on remote real-time monitoring of concrete strength for highrise building machine during construction;Zuo;Measurement,2021