1. K. Hasegawa, J-PARC commissioning results, in: Proceedings of 2005 Particle Accelerator Conference, Knoxville, Tennessee, 2005, p. 220.
2. The spallation neutron source beam commissioning and initial operations;Henderson,2015
3. A.M. Lombardi, et al. Linac4: from initial design to final commissioning, in: Proceedings of IPAC2017, Copenhagen, Denmark, TUYA1, 2017, p. 1217.
4. Physics design of the 8 GeV H-Minus Linac;Ostroumov;New J. Phys.,2006
5. J.-F. Ostiguy, et al. Overview of beam optics in project -X SC CW Linac, in: Proceedings of HB2010, Morschach, Switzerland, TUo1B04, 2010.