1. J.T. Seeman, PEP II status and plans, SLAC-PUB 6854.
2. RF feedback development for the PEP-II b factory;Corredoura,1994
3. D. Teytelman, Architectures and algorithms for control and diagnostics of coupled-bunch instabilities in circular accelerators, SLAC-Report, 633.
4. Analysis of longitudinal beam dynamics behavior and RF system operative limits at high-beam currents in storage rings;Mastorides;Phys. Rev. ST Accel. Beams,2008
5. LHC Design Report, Vol. 1 : The LHC Main Ring;Brüning,2004