1. M.A. Plum, D.E. Anderson, C.N. Barbier, M.S. Champion, M.S. Connell, J. Galambos, M. Harvey, M.P. Howell, S.H. Kim, J. Moss, B. Riemer, R.W. Steffey, SNS Proton Power Upgrade Status, in: 10th International Particle Accelerator Conference (IPAC 2019), 2019.
2. Shielding and Activation Analyses for SNS 200 KW Ring Injection Beam Dump;Popova,2000
3. Design of an 18 MW vortex flow water beam dump for 500 GeV electrons/positrons of an international linear collider;Satyamurthy;Nucl. Instrum. Methods Phys. Res. A,2012
4. Design of a high power production target for the beam dump facility at CERN;Sola;Phys. Rev. Accel. Beams,2019
5. Beam impact tests of a prototype target for the beam dump facility at CERN: Experimental setup and preliminary analysis of the online results;Sola;Phys. Rev. Accel. Beams,2019