Author:
Acosta G.,Avilov M.,Bermudez J.,Blinov M.,Logatchev P.,Shiyankov S.,Tecchio L.B.,Udup E.,Zaitsev V.
Subject
Instrumentation,Nuclear and High Energy Physics
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Measurement of the response time of the delay window for the neutron converter of the SPIRAL2 project;Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment;2014-09