1. How many IVUs Can we install without sacrificing 16-mA operation;Chae,2009
2. Measurement and analysis of the impact of transverse incoherent wakefields in a light source storage ring;Brunelle;Phys. Rev. ST Accel. Beams,2016
3. S.T. Wang, D.L. Rubin, J.P. Shanks, CESR lattice for two beam operations with narrow gap undulators at CHESS, in: Proceedings of International Particle Accelerator Conference 2016, Busan, Korea, 2016, pp. 2968–2971.
4. Physics of Collective Beam Instabilities in High Energy Accelerators;Chao,1993
5. Wake and Impedance;Stupakov,2000