1. Condition of setting surge tanks in hydropower plants - a review;Bao;Renew. Sustain. Energy Rev.,2018
2. New design of tailrace conduit of hydropower plant;Krivehenko;Hydrotech. Constr.,1985
3. Transient simulation with MFSPF for right bank underground hydropower station of the Three Gorges;Li;J. Tsinghua Univ. (Sci. Technol.),1999
4. Ceiling-sloping tail tunnel design in the Pengshui underground power station;Zhang;Yangtze River,2006
5. Hydraulic characteristic analysis of changing top-altitude tail tunnel and its application;Zhou,2008