1. Periodic loading policies for real-time scheduling and control of flexible manufacturing cells;Tahboub;International Journal of Flexible Automation and Integrated Manufacturing,1994
2. Bo. Guo, K. Uchimura, Y. Nonaka, A real-time control of scheduling considering the failure of machines on flow shops, Proceedings of 3rd ISSAT International Conference on Reliability and Quality in Design, USA, 1997, pp. 202–206.
3. Optimal two- and three-stage production schedules with setup times includes;Johnson;Naval Research Logistics Quarterly,1954