1. An evaluation of flowhop sequencing heuristics;Dannenbring;Management Science,1977
2. P. Baptiste, 1996, Sub-optimal groups of sequences in the classical 2F//Cmax, International Workshop EURO WG-PMS, Poznan, Poland, 11–13 April 1996, pp. 27–30.
3. Optimal two- and three-stage production schedule with set-up times included;Johnson;Naval Research Quaterly,1954
4. P. Baptiste, K.H. Lee, A branch and bound for the F/NoIdle/Cmax, Proceedings of International Conference on Industrial Engineering and Production Management, IEPM’97, Lyon, France, 20–24 October 1997, Vol. 1, pp. 429–438.
5. Theory of Scheduling;Conway,1967