1. A. Vignier, J.-C. Billaut, C. Proust, Les problèmes de type flow shop hybride: État de l'art, journée d'études: Affectation et Ordonnancement, CNRS/GdR Automatique/Pôle SED/GT3, Tours, France, 1995, pp. 7-47.
2. Branch and bound algorithm for the flow shop with multiprocessors;Brah;European Journal of Operational Research,1991
3. Scheduling with earliest start and due date constraints on multiple machines;Bratley;Naval Research Logistics Quaterly,1975
4. A. Vignier, J.C. Billaut, C. Proust, Solving the k-stage hybrid flowshop scheduling problems, CESA96 Computational Engineering in Systems Applications, Ecole Centrale de Lille, Lille, France, 9–12 July 1996, IEEE-SMC.
5. A. Vignier, D. Dardilhac, D. Dezalay, C. Proust, An optimal approach to solve a k-stage hybrid flowshop, Workshop on Production Planning and Control, Conference Proceedings, FUCAM, Mons, Belgium, 1996, pp. 315–319.