1. Saturn says production of L-series to be slowed at Delaware plant;Associated Press,2000
2. HOP: A software tool for production scheduling at Bridgestone/Firestone off-the-road;Degraeve;European Journal of Operational Research,1998
3. Decision support system for lumber procurement and dry kiln scheduling;Huang;Forest Products Journal,1998
4. A mass production product-toplant allocation problem;Inman;Computers & Industrial Engg,2000
5. Integrated assembly line loading, design, and labor planning;Inman;Journal of Manufacturing Systems,1997