1. Analysys (2007). The business case for sub-loop unbundling in Dublin.
2. Analysys Mason (2008). The costs of deploying fibre-based next-generation broadband infrastructure. Final report for the Broadband Stakeholder Group. 8 September 2008. Ref: 12726-371. Retrieved from 〈http://www.analysysmason.com/PageFiles/5766/Analysys-Mason-final-report-for-BSG-(Sept2008).pdf〉.
3. Elixmann, D., Ilic, D., Neumann, K. -H., & Plückebaum, T. (2008). The economics of next generation access—final report. Study for the European Competitive Telecommunication Association (ECTA). Bad Honnef. September 2008.
4. European Commission (2010). Commission recommendation of 20/09/2010 on regulated access to Next Generation Access Networks (NGA). C(2010) 6223 final. SEC(2010) 1037. Brussels. 20 September 2010.
5. Fischer, W. (2009). FTTH technology considerations, presentation at “challenges for FTTB/H in Europe”. WIK conference. 23–24 March 2009.