1. ENTSO-E, Network code on requirements for grid connection, 2012.
2. ENTSO-E, Network code on load-frequency control and reserves, 2013.
3. TERNA S.p.A., Grid Code: Chapter 4—Dispatching Regulations, 2012.
4. TERNA S.p.A., Enclosure to the grid code A.15—Participation in the regulation of frequency and frequency/power, 2012.
5. Distributed generation integration in the electric grid: energy storage system for frequency control;Delfanti;J. Appl. Math.,2014