1. Frith RC. Half a career trying to understand why the roof along the longwall face falls in from time to time? In: Proceeding of 24th international conference on ground control in mining. West Virginia; 2005.
2. Frith R, Creech M. Face width optimisation in both longwall and shortwall caving environments. Final Report, ACARP Project C5015; 1997.
3. Frith R, McKavanagh B. Optimisation of Longwall mining layouts under massive strata conditions and management of the associated safety and ground control problems. End of Grant Report, ACARP Project C7019; 2000.
4. Colwell M, Frith R. A roof support design methodology for longwall installation roadways. Final Project Report, ACARP Project C19008; 2012.
5. Mark C. Pillar design methods for longwall mining. United States Bureau of Mines Information Circular 9247; 1990.